HomeInvestorsNewsroomCorporate CitizenshipCareersAbout UsContact Us
 
Hydro Plant Levels/Flows

This information is updated every hour for river users near AEP's hydroelectric facilities. See plant locations.

Table of levels and flows

Explanation of terms:

The 'Forebay' and 'Tailwater' numbers show the elevation, in feet above sea level, of the water levels just upstream and downstream of the plants. 'Tailwater Flow' is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second. One other measurement, 'Adjusted Elevation', applies only to Smith Mountain Lake. It indicates the level the lake would be if the water currently held in the lower Leesville Lake for reuse were pumped back into Smith Mountain Lake.

Last Updated 15-OCT-2008 22:05 EST.
Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS) Adjusted Elevation
Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS) Adjusted Elevation
Roanoke River
Niagara 885.00 884.81
Smith Mountain 795.00 789.71 612.87 792.44
Leesville 613.00 612.34 531.76
New River
Buck 2003.40 2002.95 1959.82 539
Byllesby 2079.20 2078.84 2022.07 326
Claytor 1846.00 1845.81 1729.42 774
Kanawha River
London 614.00 613.95 590.50 1656
Marmet 590.00 590.23 565.91 1524
Winfield 566.00 566.20 538.95 1917
James River
Reusens 550.70 549.95 516.77 480
Ohio River
Racine 560.00 560.96 538.60 6321
Saint Joseph River
Constantine 782.90 782.85 771.45
Mottville summer: 770.40
winter: 770.00
770.38 759.35 1630
Elkhart summer: 741.50
winter: 739.50
741.54 722.29
Twin Branch 717.10 717.04 695.66 3085
Buchanan summer: 637.50
winter: 637.00
637.54 624.40 2823
Berrien Springs 623.50 623.51 591.52 3561

 

FOR CURRENT RESERVOIR LEVELS, CALL 540-985-2767 OR CONSULT THE WEBSITE AT AEP.COM.

ALL FLOW MODIFICATIONS ARE CONTINGENT UPON RESTRICTIONS AND REQUIREMENTS THAT MAY BE CAUSED BY EXTREME WEATHER OR OTHER DEMANDS. CHANGES MAY BE MADE WITHOUT NOTICE

DUE TO BELOW NORMAL INFLOWS AND DROPPING LAKE LEVELS AT SMITH MT PROJECT DEQ HAS AUTHORIZED THE FOLLOWING: DUE TO CONTINUED LOWER INFLOWS, APPALACHAIN HAS MODIFIED ITS RELEASES TO PROVIDE A DISCHARGE OF APPROXIMATELY 480 CFS FROM LEESVILLE DAM. THE REVISED FLOW IS A VARIANCE OF THE MINIMUM FLOW OF 650 CFS AS ESTABLISHED BY THE FERC LICENSE. INCREASED WEEKEND FLOW OF 650 CFS WILL OCCUR ONLY BETWEEN 8:00 A.M. AND 8:00 P.M. ON SATURDAYS FOR THE LONG ISLAND, VIRGINIA AREA. RELEASES MAY BE REVISITED IF THE AREA EXPERIENCES A SIGNIFICANT RAINFALL EVENT OR IF OTHER CONDITIONS AFFECT LEVELS OR GENERATION OPERATIONS.

CLAYTOR PLANT WILL BEGIN PEAKING OPERATION THURSDAY OCTOBER 16, 2008. PLANT PEAKING WILL BE A PART OF NORMAL OPERATION UNTIL APRIL 15, 2009 WHEN LEVELIZED FLOW OPERATION WILL BEGIN FOR RECREATIONAL FLOW ENHANCEMENTS,

THE CLAYTOR LAKE DRAWDOWN WILL START MONDAY, NOVEMBER 3, 2008. THE LAKE WILL BE LOWERED NO MORE THAN ONE FOOT PER DAY UNTIL THE ELEVATION IS DOWN FIVE (5) FEET BY SATURDAY MORNING, NOVEMBER 8, 2008. THE LAKE WILL BE DOWN FIVE FEET UNTIL SATURDAY EVENING, NOVEMBER 22, WHEN, AT THAT TIME, THE LAKE WILL BE ALLOWED TO REFILL.

PLEASE NOTE:IN THE EVENT OF PRECIPITATION OR SYSTEM EMERGENCY, THE RELEASES FROM ANY HYDRO FACILITY COULD CHANGE WITHOUT NOTIFICATION.

AS OF 06:00 THIS MORNING (10/15/2008), INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 2989CFS AND DISCHARGE FROM LEESVILLE 446CFS. THE ADJUSTED RESERVOIR ELEVATION WAS 791.45 FT. THE FLOW AT THE USGS GAUGE AT BROOKNEAL WAS 535 CFS (6.06 FT.) AND AT ALTAVISTA 600CFS (2.93 FT.)

Use of this site constitutes acceptance of the AEP Terms and Conditions. © 1996-2008 American Electric Power. All Rights Reserved.