You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tailwater" numbers show the feet above sea level of the water levels immediately upstream and downstream from our plants.
  • "Tailwater Flow" is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.401995.321949.581617
Byllesby2079.202071.862020.872486
Claytor1846.001845.191731.273200
See plant-specific notices below. Data last updated on Apr 7 2025, 6:23 AM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.01591.909127
Marmet590.00590.21570.227228
Winfield566.00566.28553.960
See plant-specific notices below. Data last updated on Apr 7 2025, 6:23 AM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00885.84
Smith Mountain795.00794.16606.35
Leesville613.00.00605.86534.001129
See plant-specific notices below. Data last updated on Apr 7 2025, 6:23 AM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90784.23772.94
MottvilleSummer: 770.40
Winter: 770.00
770.41761.522108
Elkhart741.50
winter: 739.50
741.56723.14
Twin Branch717.10716.91697.528418
BuchananSummer: 637.50
Winter: 637.00
637.47627.379123
Berrien Springs623.50623.53600.5910596
See plant-specific notices below. Data last updated on Apr 7 2025, 6:23 AM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Monday April 07, 2025, inflow to the Smith Mountain Project is 877 CFS and the discharge from Leesville is 1130 CFS. The adjusted reservoir elevations is 794.9 ft. The flow rate at the USGS Gauge at Brookneal is 1780 CFS, Stage 5.40 ft. and at Altavista 1390 CFS, Stage 2.65 ft...